Skip to main content

Romania speeds up motorway work, including A1 TENT route

Romania’s transport ministry has cut red tape to speed up 13 road projects this year. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year. The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before
August 2, 2018 Read time: 2 mins
Part of AECOM’s Romanian A1 work (photo courtesy of AECOM)

Romania’s transport ministry has cut red tape to speed up 13 road projects this year.

Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

The A1 – around 400km are open - is part of the Trans-European Transport Networks Rhine-Danube Corridor and as such, gets 85% of its funding from the European Union.

Companies that have worked on the A1 Include 1397 AECOM that supervised construction the 9.6km Lugoj bypass in March 2008. Work included a 100m bridge over Timis River and two overpasses.

AECOM provided overall project management covering supervision of the works, including services during the defects notification period, assessment and approval of the materials, equipment and workmanship.

For more information on companies in this article

Related Content

  • Research to maximise safety in Swedish tunnel route
    January 10, 2013
    The European Union provide €1.4 million from the TEN-T Programme a project to maximise road and tunnel safety on the planned Stockholm bypass in Sweden. The project forms part of the Nordic Triangle railway/road axis (TEN-T Priority Project 12), will help ensure safety on the new route. The project was selected for funding under the 2011 TEN-T Annual Call. The work will cover important safety and security studies and tests for the Stockholm bypass, which will feature 18km of tunnels. These studies aim to pr
  • AECOM wins major contract in Qatar
    June 19, 2013
    AECOM Technology Corporation is working on a US$148 million contract for a section of the Doha Expressway project in Qatar. The three year contract is for construction-supervision and design-review services for the Group 7 section of the Doha Expressway. This new highway will connect Al Khor and Mesaieed. The project is for a 168km stretch of highway, which will provide an important link for Doha’s new port and will also help improve the traffic flow for heavy vehicles around the city. The work will include
  • Braila Bridge in Romania inauguration
    June 27, 2023
    Romania’s landmark Braila Bridge link is having its official inauguration.
  • Malaysia to tender for more Pan Borneo sections
    April 30, 2019
    The Malaysian government will soon tender for three more sections of the 706km Pan Borneo Highway project in the state of Sabah. The Pan Borneo Highway - also known as Trans-Borneo Highway or Trans-Kalimantan Highway - is a road network on Borneo Island connecting the Malaysian states of Sabah and Sarawak to the country of Brunei and Indonesia’s Kalimantan region. The length of the section within the Malaysian states is likely to be just under 2,100km. The Bruneian section is 168km and the Indonesian