Skip to main content

Romania speeds up motorway work, including A1 TENT route

Romania’s transport ministry has cut red tape to speed up 13 road projects this year. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year. The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before
August 2, 2018 Read time: 2 mins
Part of AECOM’s Romanian A1 work (photo courtesy of AECOM)

Romania’s transport ministry has cut red tape to speed up 13 road projects this year.

Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

The A1 – around 400km are open - is part of the Trans-European Transport Networks Rhine-Danube Corridor and as such, gets 85% of its funding from the European Union.

Companies that have worked on the A1 Include 1397 AECOM that supervised construction the 9.6km Lugoj bypass in March 2008. Work included a 100m bridge over Timis River and two overpasses.

AECOM provided overall project management covering supervision of the works, including services during the defects notification period, assessment and approval of the materials, equipment and workmanship.

For more information on companies in this article

Related Content

  • Romania eyes PPP for three projects, including the Rasnov-Ploiesti
    June 4, 2018
    The Government of Romania will build three motorway segments through a public-private partnership. The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.
  • Bids in for next Bucharest A0 orbital work
    August 10, 2021
    The A0 orbital motorway will run about 100km around the Romanian capital.
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • AECOM’s Masterplan for Romania
    April 20, 2012
    AECOM’s UK transport team has been selected to develop a masterplan for the Romanian national transport system. An assessment of the short, medium and long-term outlook for the country’s transport system will form part of the masterplan. It will also contain sustainability-conscious infrastructure and policy recommendations for all transport modes, including road, rail, air, Constanta Port and navigation of the Danube River.