Skip to main content

Romania speeds up motorway work, including A1 TENT route

Romania’s transport ministry has cut red tape to speed up 13 road projects this year. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year. The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before
August 2, 2018 Read time: 2 mins
Part of AECOM’s Romanian A1 work (photo courtesy of AECOM)

Romania’s transport ministry has cut red tape to speed up 13 road projects this year.

Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

The A1 – around 400km are open - is part of the Trans-European Transport Networks Rhine-Danube Corridor and as such, gets 85% of its funding from the European Union.

Companies that have worked on the A1 Include 1397 AECOM that supervised construction the 9.6km Lugoj bypass in March 2008. Work included a 100m bridge over Timis River and two overpasses.

AECOM provided overall project management covering supervision of the works, including services during the defects notification period, assessment and approval of the materials, equipment and workmanship.

For more information on companies in this article

Related Content

  • Bulgaria signs Shipka Pass deal
    June 17, 2022
    The PSVT consortium picked up the Shipka Pass Tunnel project as part of the bypass for Gabrovo City, a town of around 50,000 situated on the Yantra River.
  • Poland tenders for Czestochowa A1 motorway section
    June 18, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget. The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million. GDDKiA said that the bids will not automatically be rejected. Earlier this year GDDKiA terminated its contract with Salini Polska, signed
  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Romanian roads under construction
    May 9, 2012
    Funding worth some €177.5 million from the European Commission (EC) will pay for a highway construction project in Romania. This non-refundable financing will pay for the construction of a 27.4km stretch of the Lugoj-Dumbrava highway. This section forms part of Lugoj-Deva highway that is itself a part of the Pan-European Corridor IV.