Skip to main content

Romania speeds up motorway work, including A1 TENT route

Romania’s transport ministry has cut red tape to speed up 13 road projects this year. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year. The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before
August 2, 2018 Read time: 2 mins
Part of AECOM’s Romanian A1 work (photo courtesy of AECOM)

Romania’s transport ministry has cut red tape to speed up 13 road projects this year.

Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

The A1 – around 400km are open - is part of the Trans-European Transport Networks Rhine-Danube Corridor and as such, gets 85% of its funding from the European Union.

Companies that have worked on the A1 Include 1397 AECOM that supervised construction the 9.6km Lugoj bypass in March 2008. Work included a 100m bridge over Timis River and two overpasses.

AECOM provided overall project management covering supervision of the works, including services during the defects notification period, assessment and approval of the materials, equipment and workmanship.

For more information on companies in this article

Related Content

  • Romania retenders Lugoj-Deva section of A1
    April 20, 2022
    The Lugoj-Deva segment has been troublesome, with landslides halting work at least twice.
  • Romania set to start Sebes-Turda motorwa construction
    November 7, 2014
    Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
  • Romania to start work on the Sibiu-Pitesti A1 section in 2017
    April 17, 2015
    Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
  • EU loan for Hungary’s M4 from Budapest to Romanian border
    June 18, 2018
    The European Union will fund €265 million for construction of the last section of the M4 motorway, linking Budapest, Hungary with the Romanian border. The money will come from the EU’s Cohesion Fund that targets projects designed to boost local and regional economies and promote tourism. The link's starting point is at the junction where the M35 motorway, which connects Berettyóújfalu and Debrecen.