Skip to main content

Romania sets out road programme openings for 2019

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj. Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut. CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present. Last summer, Romania’s transport minist
January 11, 2019 Read time: 2 mins

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj.

Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut.

CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present.

Last summer, Romania’s transport ministry said it had cut red tape to speed up 13 road projects. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway – including the section between Lugoj and Deva.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

Related Content

  • Substantial motorway expansion projects planned in Bavaria
    February 2, 2017
    The budget for Germany’s Motorway Directorate for Northern Bavaria will remain at around €520 million for 2017, according to media reports. For many years the budget for the Autobahndirektion Nordbayern (ADNB) was pegged between €320-380 million. This changed last year when it was boosted to €520 million, noted the newspaper Süddeutsche Zeitung. Substantial work is planned on the A3 and A6 motorways and on bridges. The 94km on the A3 between Aschaffenburg and Würzburg will be widened to six lanes by 2
  • Wirtgen fleet helps build Romanian road
    December 17, 2013
    A fleet of Wirtgen machines is helping build a section of a major highway in Romania, the Transylvanian Autostrada A3. This 588km road connects Romanian capital Bucharest with the Hungarian border and links to the Hungarian M4 highway. Plans for the A3 got the go-ahead in 2004 and the route runs via Ploieti, Braov, Sighioara, Târgu Mure, Cluj-Napoca, Zalau and Oradea to the Hungarian border, with completion scheduled for 2017.
  • Moldova gets EBRD loan for M1, M2 upgrades
    August 28, 2023
    The work will enhance transport connectivity by strengthening core transport links with a focus on the pan-European TEN-T network.
  • Colombia’s key road transport projects
    May 10, 2019
    A series of major road transport projects are moving ahead in Colombia, with the country’s national infrastructure agency (ANI), handling most of the deals. In the country’s capital, Bogota, design work is now complete on the Calle 13 and Accesos Norte II road projects. The Calle 13 project will see an 11.5km section of route widened so that it features three lanes in either direction. The work will also include building new facilities for pedestrians and cyclists. This project is expected to cost US$1.15 b