Skip to main content

Romania sets out road programme openings for 2019

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj. Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut. CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present. Last summer, Romania’s transport minist
January 11, 2019 Read time: 2 mins

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj.

Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut.

CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present.

Last summer, Romania’s transport ministry said it had cut red tape to speed up 13 road projects. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway – including the section between Lugoj and Deva.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

Related Content

  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Romanian road project builders
    April 29, 2022
    Romanian road project will be built by an Italian-Romanian team.
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev