Skip to main content

Romania receives upwards of 20 tenders for Craiova-Pitesti highway

Romania’s National Company for the Administration of Road Infrastructure has received 20 tenders for two segments of the Craiova-Pitesti highway.
November 2, 2017 Read time: 1 min
Romania’s National Company for the Administration of Road Infrastructure has received 20 tenders for two segments of the Craiova-Pitesti highway.


Both will be around 57km long and are estimated to be worth around €435 million.

Companies that have tendered include Astaldi, Vahostav, Alsim Alarko Sanayi Tesisleri ve Ticaret, the joint venture (JV) Constructii Erbasu - Vahostav SK - Trameco, Secol Societa Edile Costruzioni e Lavori SA - Secol Romania - Tirrena Scavi JV and Spedition UMB - Tehnostrade - Consitrans JV.

The Craiova-Pitesti highway will have lanes be part of the Pan European Corridor IV.

Related Content

  • Bridging the River Tisza
    February 7, 2012
    The Hungarian government has been investing heavily in extending and improving the country's motorway and trunk road network.
  • Prenj Tunnel contract to be tendered
    July 4, 2022
    The tunnel in Bosnia will form part of the important European Corridor 5C route.
  • Norway drops planned fixed link between Moss and Horten
    October 25, 2018
    Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media. The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo. The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles m
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.