Skip to main content

Romania eyes PPP for three projects, including the Rasnov-Ploiesti

The Government of Romania will build three motorway segments through a public-private partnership. The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.
June 4, 2018 Read time: 2 mins
The Government of Romania will build three motorway segments through a public-private partnership.


The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.

Romanian media reported in November that the 2332 World Bank will support the construction of the Ploiesti – Brasov (A3) highway in Romania, prime minister Mihai Tudose said yesterday.

He met on Tuesday at the Government headquarters in Bucharest with a World Bank delegation led by Tatiana Proskuryakova.

The Government will set up a coordination committee for the future highway, under the General Secretariat of the Government, led by the deputy prime minister Ion Marcel Ciolacu, as well as a project implementation unit, under the Ministry of Transport, responsible for the technical component.

The A3 highway, with only two operational sections, will have a length of more than 600 kilometers and will link Bucharest to the border with Hungary. The works were delayed for many years on several segments, especially on the most difficult one, Comarnic-Brasov.

In May last year….A new report highlights the slow pace of road construction in Romania. This reveals that during 2016, the country only had a total of 747km of motorway class roads. The survey was carried out by Romania's National Institute of Statistics (INS). The report reveals that this is the same total motorway length as in 2015, highlighting that no new stretches were opened to traffic during 2016. Motorways account for a mere 4.2% of Romania’s total road network. The country has 86,080km of roads in all, of which 36% are either cobbled or of gravel construction and are not surfaced with either asphalt or concrete. During 2016, just 4% of Romania’s total road network saw any upgrades at all.

For more information on companies in this article

Related Content

  • Building Georgia’s transport connections to its neighbours
    October 26, 2016
    Georgia’s government aspires to turn the country into a regional transport-transit hub, and with renovated and expanded transportation infrastructure it knows that the country can offer significant opportunities to others in the region, and globally – Gordon Feller writes The Caucasus Transit Corridor (CTC) is the key transit-route between Western Europe and Central Asia for oil and gas, as well as dry cargo. CTC is part of TRACECA (TRAnsport Corridor Europe to Central Asia). This is the shortest route
  • Portugal's road safety initiative
    February 14, 2012
    The Portuguese experience with road safety has proved that planning, development, introduction, and hard work do pay off in the end. Paulo Marques Augusto, president of the National Road Safety Authority (ANSR), explained that in the last 10 years a decrease of over 50% has been achieved in the number of fatalities on the road network despite a continuing growth in traffic demand (there are five million vehicles in Portugal), and a similar reduction in travel time on most of the connections between Lisbon a
  • Portugal's road safety initiative
    April 12, 2012
    The Portuguese experience with road safety has proved that planning, development, introduction, and hard work do pay off in the end. Paulo Marques Augusto, president of the National Road Safety Authority (ANSR), explained that in the last 10 years a decrease of over 50% has been achieved in the number of fatalities on the road network despite a continuing growth in traffic demand (there are five million vehicles in Portugal), and a similar reduction in travel time on most of the connections between Lisbon a
  • Case CE reaches India milestone with compaction output
    May 14, 2018
    Case Construction Equipment India recently celebrated two major milestones. One was the production of its 10,000th vibratory compactor, while the other was the highest monthly sales volume reached in its 25 years of operations at the facility. Case Construction Equipment has rolled out the 10,000th vibratory compactor from its manufacturing plant in Pithampur, India. It claims to be the only manufacturer in India to have reached this milestone. The firm marked this important achievement with an official