Skip to main content

Romania eyes PPP for three projects, including the Rasnov-Ploiesti

The Government of Romania will build three motorway segments through a public-private partnership. The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.
June 4, 2018 Read time: 2 mins
The Government of Romania will build three motorway segments through a public-private partnership.


The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.

Romanian media reported in November that the 2332 World Bank will support the construction of the Ploiesti – Brasov (A3) highway in Romania, prime minister Mihai Tudose said yesterday.

He met on Tuesday at the Government headquarters in Bucharest with a World Bank delegation led by Tatiana Proskuryakova.

The Government will set up a coordination committee for the future highway, under the General Secretariat of the Government, led by the deputy prime minister Ion Marcel Ciolacu, as well as a project implementation unit, under the Ministry of Transport, responsible for the technical component.

The A3 highway, with only two operational sections, will have a length of more than 600 kilometers and will link Bucharest to the border with Hungary. The works were delayed for many years on several segments, especially on the most difficult one, Comarnic-Brasov.

In May last year….A new report highlights the slow pace of road construction in Romania. This reveals that during 2016, the country only had a total of 747km of motorway class roads. The survey was carried out by Romania's National Institute of Statistics (INS). The report reveals that this is the same total motorway length as in 2015, highlighting that no new stretches were opened to traffic during 2016. Motorways account for a mere 4.2% of Romania’s total road network. The country has 86,080km of roads in all, of which 36% are either cobbled or of gravel construction and are not surfaced with either asphalt or concrete. During 2016, just 4% of Romania’s total road network saw any upgrades at all.

For more information on companies in this article

Related Content

  • PPRS event highlights transport investment shortfall
    April 30, 2015
    The PPRS event in Paris highlighted the need for additional investment in road transportation – David Arminas writes. Consider the global road network. An improved road from one rural African town to another can reduce the journey time from a one-day walk to a one-hour drive. This could save lives through access to a hospital; allow small businesses to work faster by getting in supplies more quickly; allow children to attend a better equipped school. Roads affect society by allowing healthier and bett
  • Strabag thinks positive despite drop in half year group revenue
    September 2, 2016
    Publicly listed construction company Strabag reports “a very positive development” in the first six months of 2016, despite lower group revenue. Consolidated group revenue fell back 8% to €5,312.15 million.
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates