Skip to main content

Romania eyes PPP for three projects, including the Rasnov-Ploiesti

The Government of Romania will build three motorway segments through a public-private partnership. The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.
June 4, 2018 Read time: 2 mins
The Government of Romania will build three motorway segments through a public-private partnership.


The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.

Romanian media reported in November that the 2332 World Bank will support the construction of the Ploiesti – Brasov (A3) highway in Romania, prime minister Mihai Tudose said yesterday.

He met on Tuesday at the Government headquarters in Bucharest with a World Bank delegation led by Tatiana Proskuryakova.

The Government will set up a coordination committee for the future highway, under the General Secretariat of the Government, led by the deputy prime minister Ion Marcel Ciolacu, as well as a project implementation unit, under the Ministry of Transport, responsible for the technical component.

The A3 highway, with only two operational sections, will have a length of more than 600 kilometers and will link Bucharest to the border with Hungary. The works were delayed for many years on several segments, especially on the most difficult one, Comarnic-Brasov.

In May last year….A new report highlights the slow pace of road construction in Romania. This reveals that during 2016, the country only had a total of 747km of motorway class roads. The survey was carried out by Romania's National Institute of Statistics (INS). The report reveals that this is the same total motorway length as in 2015, highlighting that no new stretches were opened to traffic during 2016. Motorways account for a mere 4.2% of Romania’s total road network. The country has 86,080km of roads in all, of which 36% are either cobbled or of gravel construction and are not surfaced with either asphalt or concrete. During 2016, just 4% of Romania’s total road network saw any upgrades at all.

For more information on companies in this article

Related Content

  • Romania road tender winner selected
    November 14, 2022
    The winner has been selected in Romania for a key road tender.
  • A key section of highway is now open in Romania
    July 26, 2012
    In Romania the northern section of the bypass around the city of Constanta is open to traffic. The bypass forms part of the Pan-European Road Corridor IV and work on this section was financed by the European Bank for reconstruction and Development (EBRD). The southern stretch of the 23km bypass was completed in 2011. Now it is complete, the bypass will carry heavy port traffic away from Constanta. It will also provide a free-flowing route for tourist traffic from Romanian capital Bucharest and the north of
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports