Skip to main content

Romania to build wildlife bridges over the A1

Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.
June 17, 2019 Read time: 2 mins
Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country.


The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. Tenders will be issued for both the design and construction with work to start by the end of the summer.

When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction. The motorway starts in the western part of the capital Bucharest and connects the cities of  Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

Meanwhile, the Constructii-Hidroelektra Mehanizacija joint venture has won the tender for construction of a Transylvania motorway segment between Suplacu de Barca and Chiribis. The 26km stretch could cost nearly €77.5 million. It will have 19 bridges, viaducts and passageways.

Another Transylvania motorway contract was won by the Trameco-Vehostav consortium for construction of a 28.5km stretch between Chiribis and Biharia. The deal is worth around €69 million and includes 18 bridges, passageways and viaducts.

Related Content

  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • STRABAG wins new Romanian dual carriageway deal
    July 27, 2021
    STRABAG has been awarded a major new Romanian dual carriageway deal.
  • Czech road project awards and tender
    July 19, 2024
    Czech road projects have been awarded, with another due to open for tender.
  • A decade for completing the 105km Cork-Limerick M20
    December 10, 2018
    It could be a decade before Ireland’s 105km Cork-Limerick M20 motorway is finished, the government has warned. Road safety groups and businesses have been pushing for the €900m M20 motorway because of issues over fatalities on the existing rural route. Simon Coveney, Ireland’s deputy prime minister, said the government was committed to the route – the largest motorway project to be undertaken in the next 25 years, and money has been earmarked for it. According to Irish media, Coveney also noted tha