Skip to main content

Romania to build wildlife bridges over the A1

Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.
June 17, 2019 Read time: 2 mins
Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country.


The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. Tenders will be issued for both the design and construction with work to start by the end of the summer.

When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction. The motorway starts in the western part of the capital Bucharest and connects the cities of  Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

Meanwhile, the Constructii-Hidroelektra Mehanizacija joint venture has won the tender for construction of a Transylvania motorway segment between Suplacu de Barca and Chiribis. The 26km stretch could cost nearly €77.5 million. It will have 19 bridges, viaducts and passageways.

Another Transylvania motorway contract was won by the Trameco-Vehostav consortium for construction of a 28.5km stretch between Chiribis and Biharia. The deal is worth around €69 million and includes 18 bridges, passageways and viaducts.

Related Content

  • US$346 million Charlotte, NC highway works
    August 16, 2024
    The US$346 million I-485 highway project for Charlotte, NC is underway.
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.