Skip to main content

Road upgrades for Colombia’s Boyaca

A series of road upgrades are planned for Colombia’s Boyaca Department for the 2019-2020 period. One of the projects will be for work to a 20km section of the Transversal de Boyaca Route 60, which connects to the Magdalena Medio. Work will also be carried out on the Crucero-Pajarito stretch of the Transversal del Cusiana Route 62, including several bridge upgrades. Repaving work will be carried out on the Duitama-Presidente stretch of Route 55. Paving work is also planned for tertiary roads. In all 77km of
March 6, 2019 Read time: 1 min

A series of road upgrades are planned for Colombia’s Boyaca Department for the 2019-2020 period. One of the projects will be for work to a 20km section of the Transversal de Boyaca Route 60, which connects to the Magdalena Medio. Work will also be carried out on the Crucero-Pajarito stretch of the Transversal del Cusiana Route 62, including several bridge upgrades. Repaving work will be carried out on the Duitama-Presidente stretch of Route 55. Paving work is also planned for tertiary roads. In all 77km of road improvements are being planned by Colombia’s national road institute (2812 Invias) across Boyaca Department during this time period.

For more information on companies in this article

Related Content

  • Complex Colombia capital contract considered
    December 20, 2017
    A complex construction contract is being considered for Colombia’s capital, Bogota. Work is expected to commence for the Avenida Longitudinal de Occidente (ALO) south road project in 2019. This 24km dual carriageway link will be complex to construct as it will feature 46 bridges, as well as two intersections. Construction work is expected to cost in the region of US$336 million. The work will be carried out in two sections, with a 14.4km link from the Bogota River to the Muna Intersection. However the feasi
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Major Romanian road projects are underway
    January 23, 2023
    Many major Romanian road projects are currently underway.
  • Colombia continues tunnel plans
    February 17, 2012
    With work on Colombia's first La Linea tunnel still incomplete, discussions are now being held regarding plans for the second tunnel.