Skip to main content

Rijkswaterstaat starts A1 renovation

Renovation and widening of the A1 motorway in the Netherlands will start this month, according to the Dutch environment and infrastructure agency Rijkswaterstaat. The section covers 65km, between Apeldoorn and junction Azelo. Work is expected to take around 10 years and cost about €400 million. The A1 – 199km long - connects the capital city Amsterdam, near the interchange of Watergraafsmeer, with the German border near Oldenzaal and Bad Bentheim, and the German Autobahn BAB 30. On its way, it crosses
January 23, 2019 Read time: 1 min

Renovation and widening of the A1 motorway in the Netherlands will start this month, according to the Dutch environment and infrastructure agency Rijkswaterstaat.

The section covers 65km, between Apeldoorn and junction Azelo. Work is expected to take around 10 years and cost about €400 million.

The A1 – 199km long - connects the capital city Amsterdam, near the interchange of Watergraafsmeer, with the German border near Oldenzaal and Bad Bentheim, and the German Autobahn BAB 30. On its way, it crosses four provinces: North Holland, Utrecht, Gelderland and Overijssel.

Related Content

  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Germany to cut red tape for bridge construction up to 2027
    October 5, 2017
    The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working