Skip to main content

Republic of Ireland’s N25 New Ross Bypass achieves financial close

The €230 million N25 New Ross Bypass public-private partnership (PPP) project in County Wexford, Republic of Ireland has reached financial close. Mott MacDonald is technical advisor on the public-private partnership, awarded by the National Roads Authority, otherwise known as Transport Infrastructure Ireland. Work will be carried out by BAM Ireland and Dragados, a construction division of ACS Group, based in Spain. The scheme involves construction of 13.6km of dual carriageway and 1.2km of new or u
March 3, 2016 Read time: 2 mins
The €230 million N25 New Ross Bypass public-private partnership (PPP) project in County Wexford, Republic of Ireland has reached financial close.

2579 Mott MacDonald is technical advisor on the public-private partnership, awarded by the 5525 National Roads Authority, otherwise known as Transport Infrastructure Ireland.

Work will be carried out by 7456 BAM Ireland and 4761 Dragados, a construction division of 917 ACS Group, based in Spain.

The scheme involves construction of 13.6km of dual carriageway and 1.2km of new or upgraded single carriageway. It will also link the N25 with the N30 New Ross to Enniscorthy route.

Contractors will also build a 900m three-tower extrados bridge over the River Barrow - the longest of its kind in the world – to connect Pink Point in County Kilkenny with Stokestown in County Wexford.

Mott MacDonald has been involved in the project since the original feasibility study in 1999, bringing the project successfully through all stages from feasibility, through route selection and preliminary design, to tender preparation and specimen design. The consultancy will now provide design review and construction monitoring services in an ongoing role.

“Our work on this scheme builds on our role on the award-winning N25 Waterford Bypass following its opening in 2009,” said John Murphy, Mott MacDonald’s project director.

Construction of the N25 New Ross Bypass is due to be completed in 2019, which will be followed by a 25-year operation and maintenance period.

Among Mott MacDonald’s other recent PPP projects are the Turkey’s northern Marmara sea motorway and Istanbul’s third Bosphorus bridge, all as part of a £1.6 billion project to build, operate and maintain a 95km motorway and the world’s largest combined road/rail stiffened suspension bridge. Mott MacDonald is the lenders’ technical advisor for the 10-year concession period.

Also, in the Netherlands, Mott MacDonald is the lender’s technical advisor for the A9 Gaasperdammerweg motorway. The €700 million project will reconstruct and expand the A9 motorway between the junctions of Holendrecht and Diemen.

For more information on companies in this article

Related Content

  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.
  • Mott MacDonald to advise UK’s DfT
    June 18, 2025
    Mott MacDonald will advise the UK’s DfT.
  • Mott MacDonald Sweco JV to design part of A96 dualling, Scotland
    June 16, 2016
    A Mott MacDonald and Sweco joint venture has been appointed by Transport Scotland to carry out route option assessment and detailed design work for dualling of the A96 highway between Hardmuir and Fochabers. The nearly 47km stretch of the road will provide users with improved journey times between two of Scotland’s economic hubs, the cities of Inverness and Aberdeen. In 2011, the Scottish Government published its Infrastructure Investment Plan which set out the Government’s plans for infrastructure i
  • EIB backing Irish motorway link
    April 30, 2014
    The European Investment Bank (EIB) is providing financial backing worth €144 million for the new M17/M18 Gort-Tuam motorway project. The M17/M18 Gort to Tuam PPP Scheme is situated in the west of Ireland and will be constructed as a four lane motorway that will replace the existing N17/N18 roads. This new motorway will reduce journey times by around 20 minutes and has an overall cost estimated at €550 million. Construction work will start during this year and this is the second transport PPP to be signed un