Skip to main content

Ramboll to upgrade two junctions on the A55 North Wales Expressway

Engineering consultancy Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels. Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route
December 13, 2017 Read time: 2 mins

Engineering consultancy 6801 Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. 

The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels.

Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route between Dublin and Moscow.

The length of Euro-route within the UK - Hull to Holyhead - comprises grade-separated interchanges allowing the free flow of traffic, apart from the at-grade roundabouts at junctions 15 and 16.

Ramboll will have to consider the encroachment of development and buildings on the inland side of the road and the proximity of the railway on the coastal side. Ramboll said that the space available for free flow links and slip roads is highly constrained.

For more information on companies in this article

Related Content

  • UK road contracts planned
    December 13, 2021
    Major road contracts are planned for the UK.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • North East UK’s A19 /A1058 Coast Road triple-deck junction opens
    April 5, 2019
    More than 80,000 drivers a day are now using the recently opened and - first ever - North Tyneside triple-deck highway junction in the northeast. England’s A19 /A1058 Coast Road junction improvement scheme, being done for the client Highways England, was opened on time. However, there will be some overnight closures in the next several weeks to complete the landscaping, traffic light and footpath work. A time capsule has been buried on site and is due to be opened in 2118. Work started in June 2016 on
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar