Skip to main content

Ramboll to upgrade two junctions on the A55 North Wales Expressway

Engineering consultancy Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels. Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route
December 13, 2017 Read time: 2 mins

Engineering consultancy 6801 Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. 

The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels.

Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route between Dublin and Moscow.

The length of Euro-route within the UK - Hull to Holyhead - comprises grade-separated interchanges allowing the free flow of traffic, apart from the at-grade roundabouts at junctions 15 and 16.

Ramboll will have to consider the encroachment of development and buildings on the inland side of the road and the proximity of the railway on the coastal side. Ramboll said that the space available for free flow links and slip roads is highly constrained.

For more information on companies in this article

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • Towards sustainable mobility
    April 12, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility.From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes. Space on roads throughout the modern world is decreasing as the volume of cars and road users increases. How can mobility be safeguarded without compromising quality of life or environmental well-being? As engineers, we have a responsib
  • Towards sustainable mobility
    February 20, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility. From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes