Skip to main content

Progress for planned Denmark-Germany immersed tunnel

A Danish company, Femern, is submitting documents for the Fehmarn Belt Fixed Link, an immersed tunnel that will connect Germany with Denmark. The project is expected to cost in the order of €5.5 billion to construct. An 18km immersed tunnel will link the islands of Fehmarn and Lolland. Fehmarn Island is already connected with Northern Germany’s mainland by a bridge, while Lolland is already connected by a tunnel and bridges with Zealand, a link that runs via the island of Falster
October 30, 2013 Read time: 2 mins
A Danish company, 4782 Femern, is submitting documents for the Fehmarn Belt Fixed Link, an immersed tunnel that will connect Germany with Denmark. The project is expected to cost in the order of €5.5 billion to construct. An 18km immersed tunnel will link the islands of Fehmarn and Lolland. Fehmarn Island is already connected with Northern Germany’s mainland by a bridge, while Lolland is already connected by a tunnel and bridges with Zealand, a link that runs via the island of Falster. This new immersed tunnel would reduce the travel distance using the existing links and cut journey times between Germany and Denmark, as well as Germany and Norway and Sweden. The route is expected to provide a major trade connection for the region as it will also be close to Hamburg, which is home to one of Europe’s largest and busiest sea ports. The German authorities are expected to approve the project in summer 2015. Most of the costs for the work will be paid for by Denmark. The tunnel connections in Germany are expected to cost some €800 million, but could conceivably climb higher. The tunnel will be the world’s longest immersed tunnel as well as being the world’s longest tunnel combining rail and road connections when it is completed. Initially the link was to have been open to vehicle and rail traffic by 2018 but a series of delays has now pushed back the expected completion date to 2021.

For more information on companies in this article

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
  • New German bridge links
    July 9, 2012
    Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg. The Danish engineering consultancy company Cowi has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.
  • Cost of Denmark-German link
    February 20, 2012
    Discussions on a new link between Denmark and Germany continue with Denmark's Transport Ministry publishing data showing that the proposed bridge option would be more costly than a tunnel.