Skip to main content

Preparations for Polish project – widening work

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
December 13, 2018 Read time: 1 min

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish ministry of infrastructure has signed off on the budget for the work to be carried out

Related Content

  • Ecuador road widening project planned
    July 3, 2018
    A road widening project worth US$134.3 million is now going ahead in Ecuador. The road connecting Aloag with Santo Domingo is being improved along a 100km stretch, widening the route so that it will feature two lanes in either direction instead of the single lane in either direction at present. This will boost the transport connection between Pichincha Province and Santo Domingo de los Tsachilas Province. The contract was originally awarded in 2015 but stalled in 2017 following a disagreement over tolling.
  • Poland road tenders being announced
    October 5, 2015
    Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.
  • Polish road dispute
    February 28, 2012
    A string of legal and political battles look likely in the aftermath of a broken highway contract in Poland.
  • Slovakia road projects – bidding opens, funding found
    October 19, 2018
    Bidding is underway in Slovakia for the R2 Krivan-Mytna expressway project, which is being handled by the local highway firm NDS. The deadline for bids opened in July 2018 and has been extended now for the second time. Bids will now be received until the 9th November 2018. The project for the 9.1km route is expected to cost €280 million to build and should take 48 months to complete. In addition, Slovakia’s Transport and Construction Ministry is boosting its budget for road repairs. The next 48 months will