Skip to main content

Preparations for Polish project – widening work

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
December 13, 2018 Read time: 1 min

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish ministry of infrastructure has signed off on the budget for the work to be carried out

Related Content

  • Algeria-Mauritania road construction
    December 12, 2024
    Construction for key Algeria-Mauritania road connection
  • Renovation work commencing on Russia’s Scandinavia Highway
    February 26, 2014
    Upgrade work looks set to commence on the Scandinavia Highway at the end of 2014. The design work for three of the highway stretches has been completed and preparatory work has commenced on the first section. The design work for the fourth and fifth sections will commence once the upgrade work is underway on the first, second and third stretches. The project is due for completion in 2019 and will see the highway being improved and widened, with three lanes in either direction along its length. The work also
  • Financing secured for Kenya road upgrade
    October 9, 2019
    Financing has been secured to pay for upgrading work for the road connecting Kenol, Sagana and Marwa in Kenya. The 84km route includes a stretch of the A2 road and will be widened to dual carriageway status, with two lanes in either direction and a central divider, rather than one lane in in either direction at present. Funding is being provided by the African Development Bank (AfDB) in the shape of loans worth US$237 million. The AfdB’s loan package will pay for around 69% of the work, with the People’s Ba
  • Major road deals for France
    May 3, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.