Skip to main content

Preparations for Polish project – widening work

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
December 13, 2018 Read time: 1 min

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish ministry of infrastructure has signed off on the budget for the work to be carried out

Related Content

  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.
  • Morocco motorway widening work underway
    March 13, 2020
    Widening work is now underway for key Morocco motorway links.
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Lithuania highway project progressing
    September 18, 2019
    Work is now complete on Lithuania’s Panevėžys bypass, which has been widened so that it features three lanes in either direction. This 22km road rebuilding project was carried out by local contractor, Panevezio Keliai, in a deal worth €44.6 million. Financing for the work was provided jointly by the EU and the local authorities. A novel feature of the project is that traffic lanes are reversible to help reduce congestion at peak periods and account for traffic flow. The project forms part of the wider plan