Skip to main content

Preparations for Polish project – widening work

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
December 13, 2018 Read time: 1 min

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish ministry of infrastructure has signed off on the budget for the work to be carried out

Related Content

  • Polish road authority GDDKiA will re-tender for the S14
    May 12, 2017
    The Polish ministry of infrastructure announced that it will retender for building the last 27km section of the Expressway S14 around Lodz. Poland’s road authority GDDKiA said it was not satisfied with the offers it had received during the tender. They were higher than the budget by around €59 million, reaching upwards of €487 million. Local governments reportedly fear that construction delays could disrupt the Specialised Expo from June to September, 2022 if the city of Lodz were to be chosen. The wining c
  • STRABAG wins tricky Polish project
    May 2, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Chinese expressway expansion works
    April 11, 2023
    Chinese expressway expansion works are underway.
  • Polish capital route project being planned
    September 9, 2019
    Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.