Skip to main content

Power China wins more Belgrade ring road work

Serbia has signed a deal with Power China to construct the Ostruznica-Bubanj Potok section of the capital Belgrade’s ring road.
November 2, 2017 Read time: 1 min
Serbia has signed a deal with Power China to construct the Ostruznica-Bubanj Potok section of the capital Belgrade’s ring road.


The next tender for ring road construction will be the 31km Bubanj Potok-Vinca-Pancevo section.

Serbia’s ministry of construction estimates that the value of Chinese contracts in the country is just over €2 billion, but that could rise to around €6 billion with help from the 3422 Chinese Exim Bank.

For more information on companies in this article

Related Content

  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
  • Bangladesh bridge contract proposal
    July 24, 2019
    A Chinese contractor is expressing interest in building a major bridge connection in Bangladesh.
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Poland: Budimex signs Olsytyn city ring-road contract
    April 4, 2016
    Budimex has signed a contract worth more than €214.3 million for construction of the second section of Olsztyn's ring-road. The section will be around 14.7km long and will be completed within 28 months. The bid by Budimex was the fourth lowest offer in the tender, as announced by the Polish General Directorate for National Roads and Motorways (GDDKiA).