Skip to main content

Power China wins more Belgrade ring road work

Serbia has signed a deal with Power China to construct the Ostruznica-Bubanj Potok section of the capital Belgrade’s ring road.
November 2, 2017 Read time: 1 min
Serbia has signed a deal with Power China to construct the Ostruznica-Bubanj Potok section of the capital Belgrade’s ring road.


The next tender for ring road construction will be the 31km Bubanj Potok-Vinca-Pancevo section.

Serbia’s ministry of construction estimates that the value of Chinese contracts in the country is just over €2 billion, but that could rise to around €6 billion with help from the 3422 Chinese Exim Bank.

For more information on companies in this article

Related Content

  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Serbia in talks with Shandong Hi-Speed and China Road and Bridge
    October 22, 2014
    Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf