Skip to main content

Polish road tender underway

Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority GDDKiA. Other bidders included the Porr Polska consortium and a construction consortium comprising contractors Budimex and Strabag.
February 3, 2015 Read time: 1 min
Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor 1324 Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority 1361 GDDKiA. Other bidders included the 3976 Porr Polska consortium and a construction consortium comprising contractors 3302 Budimex and 945 Strabag.

For more information on companies in this article

Related Content

  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Key Polish projects are underway or compelte
    December 4, 2014
    The Polish town of Marki is to benefit from a new 15km ring road, which will be constructed by a consortium comprising the contractors Astaldi and Salini. The project has a total value of some €167.4 million. The first section will measure 8.1km and run from Kobylka and Marki junctions. Salini plans to complete this stretch in 32 months. Meanwhile, the second section will run between Radzymin Pld and Kobylka junctions and will be completed in 36 months. Meanwhile work on the final section of the S8 road has
  • Go-ahead for Polish tunnel project
    July 5, 2018
    The tunnel project to connect northern Poland’s Uznam and Wolin islands is now getting the go-ahead.
  • Poland is planning a series of highway projects
    March 15, 2013
    Poland’s Ministry of Transport plans to invest heavily in road projects from 2014-2020. The Polish road authority, GDDKiA, will invest €16.91 billion in new roads. A key project will be for the section of the Berlin-Lisbon A2 highway that runs through Poland. This will run through Zakret near Warsaw and connect to the Minsk Mazowiecki ring road and is expected to cost close to €1.7 billion. Meanwhile the A1 highway linking Pyrzowice and Tuszyn will cost in excess of €1.8 billion. GDDKiA is also planning to