Skip to main content

Polish Via Carpathia section attracts 11 bids

Turkish contractor Kolin Insaat has submitted the lowest bid.
By David Arminas July 17, 2020 Read time: 1 min
Poland’s GDDKiA is delighted with Turkish bid around Bialystok (photo © Didreklama/Dreamstime)

Turkish contractor Kolin Insaat has submitted the lowest bid for the section of Poland’s S19 Via Carpathia between the villages of Zachod and Ksiezno.

Kolin Insaat’s offer – one of 11 bids - is €130.1 million (US$150.06 million) for the design and build contract in the metropolitan area of Bialystok, a city in eastern Poland.

The highest bid of €161.1 million (US$182.5 million) came in from Polish contractor Mostostal, according to Poland’s General Directorate for National Roads and Motorways, GDDKiA.

The winner is expected to be announced this autumn with work starting soon after. Completion is set for 2024.

The S19, as well as the S61, constitute part of the trans-European route Via Carpathia, of which many sections are either under construction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

For more information on companies in this article

Related Content

  • Russia’s trans-continental route
    August 10, 2018
    Russia is spending US$10 billion on building a 2,000km section of road connecting China with the EU – Eugene Gerden reports Russia has now started building a 2,000km section of a new transcontinental route, which will connect China and the EU. According to senior officials from the Russian Ministry of Transport, which is implementing the project, the new road, will be known as the Meridian and will stretch through the Russian territory that borders with Kazakhstan and Belarus. This route forms the Russian
  • Poland: Budimex signs Olsytyn city ring-road contract
    April 4, 2016
    Budimex has signed a contract worth more than €214.3 million for construction of the second section of Olsztyn's ring-road. The section will be around 14.7km long and will be completed within 28 months. The bid by Budimex was the fourth lowest offer in the tender, as announced by the Polish General Directorate for National Roads and Motorways (GDDKiA).
  • Poland road tenders being announced
    October 5, 2015
    Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.
  • Tenders placed for Polish expressway project
    July 22, 2014
    Bidding has been strong for an expressway project in Poland. The S7 route will connect Olsztynek and Milomyn with the Ostroda ring road. The project is expected to cost in the region of €350.64 million to construct in all. Seven bidders competed for the project with a consortium comprising contractors Intercor, Erbedim and Pozbud making the highest offer at €416.42 million. The lowest offer meanwhile came from another construction consortium comprising the companies Salini, Todini and Impregilo with a bid o