Skip to main content

Polish Via Carpathia section attracts 11 bids

Turkish contractor Kolin Insaat has submitted the lowest bid.
By David Arminas July 17, 2020 Read time: 1 min
Poland’s GDDKiA is delighted with Turkish bid around Bialystok (photo © Didreklama/Dreamstime)

Turkish contractor Kolin Insaat has submitted the lowest bid for the section of Poland’s S19 Via Carpathia between the villages of Zachod and Ksiezno.

Kolin Insaat’s offer – one of 11 bids - is €130.1 million (US$150.06 million) for the design and build contract in the metropolitan area of Bialystok, a city in eastern Poland.

The highest bid of €161.1 million (US$182.5 million) came in from Polish contractor Mostostal, according to Poland’s General Directorate for National Roads and Motorways, GDDKiA.

The winner is expected to be announced this autumn with work starting soon after. Completion is set for 2024.

The S19, as well as the S61, constitute part of the trans-European route Via Carpathia, of which many sections are either under construction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

For more information on companies in this article

Related Content

  • EU funds for Polish eastern voivodeships
    February 13, 2024
    The total available under the European Funds for Eastern Poland programme is €2.7 billion of which around €430 million is for roads.
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Green light for S6 dual carriageway section in Zachodniopomorskie
    December 14, 2016
    Poland’s Zachodniopomorskie province has given the go-ahead to the consortium set up by Dragados and Polaqua to start construction of a section of the S6. A deal was done in October 2015 for work on the 24km section of the dual carriageway between Kielpino and Kolobrzeg. The cost is estimated to be nearly €105 million. Meanwhile, a section of the S19 express road - between Slawinek junction and the northern part of the Lublin city ring road – was opened this month. Budimex built the 10km stretch in so
  • Bidding for Uganda road connecting Kampala and Jinja
    May 22, 2018
    In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De