Skip to main content

Polish Via Carpathia section attracts 11 bids

Turkish contractor Kolin Insaat has submitted the lowest bid.
By David Arminas July 17, 2020 Read time: 1 min
Poland’s GDDKiA is delighted with Turkish bid around Bialystok (photo © Didreklama/Dreamstime)

Turkish contractor Kolin Insaat has submitted the lowest bid for the section of Poland’s S19 Via Carpathia between the villages of Zachod and Ksiezno.

Kolin Insaat’s offer – one of 11 bids - is €130.1 million (US$150.06 million) for the design and build contract in the metropolitan area of Bialystok, a city in eastern Poland.

The highest bid of €161.1 million (US$182.5 million) came in from Polish contractor Mostostal, according to Poland’s General Directorate for National Roads and Motorways, GDDKiA.

The winner is expected to be announced this autumn with work starting soon after. Completion is set for 2024.

The S19, as well as the S61, constitute part of the trans-European route Via Carpathia, of which many sections are either under construction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

For more information on companies in this article

Related Content

  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Romania’s DEx12 Craiova-Pitesti on target
    November 17, 2021
    The DEx12, costing nearly €1 billion, will include 10 junctions and 75 bridges and passages.
  • Metrostav and Budimex among bidders for Poland’s S7 section
    April 25, 2017
    Poland’s highways directorate, GDDKiA, says 12 bids have been received for construction of the second section of the S7 dual carriageway. The 15km section will run from the Lesznowola junction to the Tarczyn Polnoc junction. Metrostav submitted the highest offer at €118 million, while the cheapest offer came from a consortium of Porr Polska Infrastructure and Porr Bau. Other bidders include others, Budimex, Intercor and Polaqua.
  • Polish concrete plant production
    May 17, 2022
    A Lintec CCP3000D containerised concrete plant is helping with construction and work for Polish roads.