Skip to main content

Polish capital route project being planned

Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.
September 9, 2019 Read time: 1 min

Route reviews are being carried out for a key Polish project. Poland’s highways authority, 1361 GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.

For more information on companies in this article

Related Content

  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.
  • Legal tangle over Polish highway project
    February 29, 2012
    The complex legal tangle over Poland's troubled A2 highway project is continuing to develop.
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
  • Poland road tenders being announced
    October 5, 2015
    Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.