Skip to main content

Polish capital route project being planned

Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.
September 9, 2019 Read time: 1 min

Route reviews are being carried out for a key Polish project. Poland’s highways authority, 1361 GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.

For more information on companies in this article

Related Content

  • Polish project plan
    February 28, 2012
    The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project.
  • Norway road deal awarded
    April 1, 2019
    A project for a 19km stretch of Norway’s E6 highway has been awarded. The work will be carried out by the contractor Hæhre Entreprenør, in partnership with the consultants Dr Ing A Aas Jakobsen Trondheim and Sweco Norge. The deal is worth €420 million (NOK 4 billion) and was awarded by Norway’s state-owned road firm Nye Veier. The new section of highway will connect Kvithammar and Åsen, with construction commencing in 2020 and expected to take until 2025 or 2026 to complete. The work includes driving four n
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • Polish project hits rocky road
    March 5, 2012
    The project to build a section of the A4 highway in Poland between Brzesko and Wierzchoslawice in the South of the country looks set to hit major legal issues.