Skip to main content

Poland’s next A2 motorway section to cost €348million

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
January 21, 2019 Read time: 2 mins

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia.

A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023.

Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan.

The A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt, where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. It is part of the European route E30 connecting Berlin and Moscow. On 4 June 2014, the motorway was officially named Autostrada Wolności (Motorway of Freedom).

The plan is for the A2 to be gradually extended eastwards from the capital Warsaw to the Terespol area where it will connect to the M1 highway. A2 does not officially run through Warsaw. Instead the eastern and western segments will be connected by other roads including the S2 Expressway.

Related Content

  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
  • We're here to help
    July 16, 2012
    Formed at the end of the Cold War, the European Bank for Reconstruction and Development has raised, and loaned, billions to revitalise infrastructure from central Europe to central Asia as Patrick Smith reports One of the highlights of the year for Thomas Maier has been the recent trip to Bratislava, the capital of Slovakia, where history was made. As the Business Group director in charge of the infrastructure sector at the European Bank for Reconstruction and Development (EBRD) he was present when contract
  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
  • EC approves Croatia’s Istarski Ipsilon – Istsrian Y - expansion
    June 22, 2018
    The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network. The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula. The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.