Skip to main content

Poland’s next A2 motorway section to cost €348million

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
January 21, 2019 Read time: 2 mins

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia.

A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023.

Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan.

The A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt, where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. It is part of the European route E30 connecting Berlin and Moscow. On 4 June 2014, the motorway was officially named Autostrada Wolności (Motorway of Freedom).

The plan is for the A2 to be gradually extended eastwards from the capital Warsaw to the Terespol area where it will connect to the M1 highway. A2 does not officially run through Warsaw. Instead the eastern and western segments will be connected by other roads including the S2 Expressway.

Related Content

  • Road user charging to pay for road improvements?
    February 20, 2012
    What is the current situation with Russian roads? It is an objective answer to this question that is contained in the official report of the Federal State Statistics Service for 2009. Here it states: "...public roads are of poor quality: 8.4% of roads accounted for groundwater, nearly a third of roads are gravel, rubble or cobblestone.
  • Frankfurt highway section to run in tunnel
    March 12, 2019
    A tunnel has been proposed for a highway stretch in the German city of Frankfurt. The proposals put forward by the city authorities call for a 1km stretch of the A661 Autobahn to run in a cut and cover tunnel. The project would cost around €350 million and would allow housing to be built over the top of the route. A substantial portion of the funding would have to be sourced from the German Federal Government and the Hesse State Government for the project to go ahead however. If the proposals are accepted,
  • Serbia to tender for Nis-Pristina motorway by end of 2018
    March 6, 2018
    The first tender for construction of the Nis-Pristina motorway could be called by the end of his year, according to Zorana Mihajlovic, Serbia’s minister of construction. Value of the first phase of the project is estimated at €240 million. Around 20% of the amount will be financed from aid, while the remainder will be secured by the EBRD (European Bank for Reconstruction and Development) and the EIB (European Investment Bank).
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill