Skip to main content

Poland’s next A2 motorway section to cost €348million

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
January 21, 2019 Read time: 2 mins

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia.

A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023.

Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan.

The A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt, where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. It is part of the European route E30 connecting Berlin and Moscow. On 4 June 2014, the motorway was officially named Autostrada Wolności (Motorway of Freedom).

The plan is for the A2 to be gradually extended eastwards from the capital Warsaw to the Terespol area where it will connect to the M1 highway. A2 does not officially run through Warsaw. Instead the eastern and western segments will be connected by other roads including the S2 Expressway.

Related Content

  • Meet Die Autobahn des Bundes
    November 8, 2021
    Only recently has Germany created a central organisation to maintain and develop the nation’s 13,200km of motorways, called autobahns. Moving from 16 state-run operation centres to one lead centre is a challenge but essential, says Gerd Riegelhuth.
  • Polish road dispute
    February 28, 2012
    A string of legal and political battles look likely in the aftermath of a broken highway contract in Poland.
  • Netherlands to finish widening of the A1 from Amsterdam to Germany
    July 2, 2018
    Dutch construction company Heijmans has been awarded the final contract for the A1 motorway project between Apeldoorn and Azelo in the Netherlands. The €127 million contract will see the widening of 28km of motorway between Twello and Deventer to eight lanes and the road between Deventer-Oost and Rijssen widened to six lanes. Works is expected to start in spring 2019 for completion in the autumn 2020.
  • Cost of D1 section Hubova-Ivachnova rises 40%
    August 3, 2023
    In Slovakia, the 15km Ružomberok bypass, including the 3.6km Čebrať Tunnel, is now €93 million more expensive than nine years ago.