Skip to main content

Poland’s next A2 motorway section to cost €348million

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
January 21, 2019 Read time: 2 mins

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia.

A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023.

Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan.

The A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt, where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. It is part of the European route E30 connecting Berlin and Moscow. On 4 June 2014, the motorway was officially named Autostrada Wolności (Motorway of Freedom).

The plan is for the A2 to be gradually extended eastwards from the capital Warsaw to the Terespol area where it will connect to the M1 highway. A2 does not officially run through Warsaw. Instead the eastern and western segments will be connected by other roads including the S2 Expressway.

Related Content

  • New tender for section of A4 highway in Poland
    August 24, 2012
    A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia.
  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • Hungary to open M1 spur to Slovak border
    March 12, 2020
    Hungary opens high-speed route from Budapest to Slovakian capital Bratislava.
  • Strabag to build 24km section of Poland’s S6 for €83 million
    November 2, 2015
    Publically listed Strabag has won the design and build contract to build a 24km section of Poland’s S6 for €83 million. The S6 expressway links the largest cities in northern Poland, Szczecin and Gdańsk. The publicly listed construction group Strabag will design and build the section between Goleniów and Koszalin for about €83 million. Construction of the 24 km dual carriageway asphalt road with two lanes of traffic in each direction will start this month with a scheduled finish of June 2019. The cont