Skip to main content

Poland’s next A2 motorway section to cost €348million

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
January 21, 2019 Read time: 2 mins

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia.

A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023.

Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan.

The A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt, where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. It is part of the European route E30 connecting Berlin and Moscow. On 4 June 2014, the motorway was officially named Autostrada Wolności (Motorway of Freedom).

The plan is for the A2 to be gradually extended eastwards from the capital Warsaw to the Terespol area where it will connect to the M1 highway. A2 does not officially run through Warsaw. Instead the eastern and western segments will be connected by other roads including the S2 Expressway.

Related Content

  • Poland’s A1 section Pyrzowice to Tuszyn clears another hurdle
    November 11, 2014
    The Polish province of Lodzkie has signed a territorial contract that will allow construction of the Pyrzowice to Tuszyn section of the national A1 motorway. Territorial contracts are agreements between the central and regional governments in order to allow investment in key projects, such as roads. Around 90 projects worth in total US$7.63 billion will benefit from the contract. Apart from the 140km A1 motorway section, projects include rail line upgrades, Wielun and Belchatow ring roads hospital extensio
  • Grupo Rubau awarded a section of Poland’s S-61 Expressway project
    February 5, 2018
    Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Poland place Via Carpatia on list of priorities
    July 18, 2017
    The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023. The government also increased the budget for building roads by €6.7 billion to €32.1 billion. The announcements are part of the National Road Construction Programme (PBDK).