Skip to main content

Poland’s GDDKiA promises to improve road procurement processes

The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b
January 12, 2015 Read time: 2 mins
The Polish national roads authority 1361 GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with 1116 European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality.

Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also been heavily criticised for refusing to negotiate with winning contractors when unforeseen issue push up construction costs.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2988 0 oLinkExternal reported in mid 2011 Visit WH Story Page false /sections/general/news/polish-project-causes-further-legal-headaches/ false false%> that Chinese contractor China Overseas Engineering Group Co (2487 COVEC) had appealed against a decision made by GDDKiA to cancel the contract that Covec had to build a section of the A2 highway between Warsaw and Lodz. Covec's tender win was a landmark decision, the first time a Chinese firm had won a major construction contract in Europe. The firm won the tender process for the 50km highway with a bid so low that it caused some bidders to complain about undercutting.

Covec’s problems started soon after work started when material prices spiralled upwards. Delays mounted as did complaints from local sub-contractors over non-payment by the main contractor. Covec withdrew from the project in May 2011.

Despite the GDDKiA announcement that it plans to adhere to EU procurement law, the government agency remains besieged by construction firms locked in legal battles over how they have been treated. According to one news agency, the companies claim billions of euros are owed to them by Poland. Polish contractors have said some of them have gone to the wall because of lack of payment by the government. Six European governments have complained to Poland about the treatment meted out to private companies.

The GDDKiA’s also said its Podlaskie regional unit will spend around $228 million on road projects in 2015, up from $166 million last year. Among projects earmarked for completion are ring roads around Szczuczyn and Barglow, as well as the S8 section between the ring road of Zambrow and Mezenin.

For more information on companies in this article

Related Content

  • Five things road construction crews should not do
    June 19, 2015
    Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.
  • BLS Enterprises is offering new milling machine trackpads
    January 6, 2017
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • BLS Enterprises is offering new milling machine trackpads
    April 11, 2013
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • Video: Motorcyclist rescues kitten from busy intersection
    November 26, 2015
    A heart-stopping moment when a motorcyclist stopped at a busy intersection see what she thought was a leaf blowing around on the road, but was actually a tiny kitten. Click here to watch as her helmet cam records the event, including first sight of the little thing on the asphalt where the animal was only a meter or so away from traffic rushing through the intersection. A pickup just brushes by the furry ball only seconds before the motorcyclist was able to put the bike on its side stand, warn traffic awa