Skip to main content

Poland’s GDDKiA promises to improve road procurement processes

The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b
January 12, 2015 Read time: 2 mins
The Polish national roads authority 1361 GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with 1116 European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality.

Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also been heavily criticised for refusing to negotiate with winning contractors when unforeseen issue push up construction costs.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2988 0 oLinkExternal reported in mid 2011 Visit WH Story Page false /sections/general/news/polish-project-causes-further-legal-headaches/ false false%> that Chinese contractor China Overseas Engineering Group Co (2487 COVEC) had appealed against a decision made by GDDKiA to cancel the contract that Covec had to build a section of the A2 highway between Warsaw and Lodz. Covec's tender win was a landmark decision, the first time a Chinese firm had won a major construction contract in Europe. The firm won the tender process for the 50km highway with a bid so low that it caused some bidders to complain about undercutting.

Covec’s problems started soon after work started when material prices spiralled upwards. Delays mounted as did complaints from local sub-contractors over non-payment by the main contractor. Covec withdrew from the project in May 2011.

Despite the GDDKiA announcement that it plans to adhere to EU procurement law, the government agency remains besieged by construction firms locked in legal battles over how they have been treated. According to one news agency, the companies claim billions of euros are owed to them by Poland. Polish contractors have said some of them have gone to the wall because of lack of payment by the government. Six European governments have complained to Poland about the treatment meted out to private companies.

The GDDKiA’s also said its Podlaskie regional unit will spend around $228 million on road projects in 2015, up from $166 million last year. Among projects earmarked for completion are ring roads around Szczuczyn and Barglow, as well as the S8 section between the ring road of Zambrow and Mezenin.

For more information on companies in this article

Related Content

  • Volvo CE president speaks of industry giant’s goals for bauma 2013
    April 9, 2013
    Volvo Construction Equipment president Pat Olney has stressed the importance of the bauma show to the industry giant ahead of the 2013 event. Speaking during the recent inauguration of Volvo CE’s new Americas HQ in Shippensburg, Pennsylvania, he said: “Bauma is a major show in Europe and also attracts international visitors.
  • Tsurumi launches new dewatering pump on anniversary
    February 28, 2013
    Submersible pump manufacturer Tsurumi, marking its 30th anniversary in Europe, is launching a new engine driven pumps and a life-extending kit for its products. The new diesel-driven pump (4TBA82D135) is one of Tsurumi’s biggest, and is designed to work at the most demanding dewatering and sewage applications, offering a maximum flow of 2,250litres/minute and a maximum head of 18m. Tsurumi will also introduce a set of life-extending parts for its KTV and KTVE range of lightweight aluminium pumps, saying tha
  • US$2.66 billion tender for Poland’s A1 motorway will be called in mid-2013
    January 25, 2013
    Poland's General Directorate for National Roads and Motorways (GDDKiA) is to announce a US$2.66 billion [€2bn] tender in mid-2013 for the construction of the A1 motorway between Pyrzowice near Katowice and Tuszyn near Lodz. According to the head of GDDKiA, the tender for the 140km-long road will be divided into sections of around 20km. The Polish government has given up on its original idea of constructing the road on a PPP model, since Eurostat insisted that the cost of the project should be added to Polan
  • Tender process in hand for Polish ring road project
    August 27, 2014
    The tender process is opening for new road connections in Poland. Ring roads are planned around the Polish city of Radom as well as the town of Gora Kalwarii while there are plans for a new dual carriageway section of the S8 between Radziejowice and Paszko. In all the work is expected to cost€716.5 million. The tender process has been called by the Polish road administration, GDDKiA. The Radom bypass will be some 25km long while a21km stretch of the S8 will be upgraded to dual carriageway status, with this