Skip to main content

Poland’s GDDKiA promises to improve road procurement processes

The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b
January 12, 2015 Read time: 2 mins
The Polish national roads authority 1361 GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with 1116 European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality.

Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also been heavily criticised for refusing to negotiate with winning contractors when unforeseen issue push up construction costs.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2988 0 oLinkExternal reported in mid 2011 Visit WH Story Page false /sections/general/news/polish-project-causes-further-legal-headaches/ false false%> that Chinese contractor China Overseas Engineering Group Co (2487 COVEC) had appealed against a decision made by GDDKiA to cancel the contract that Covec had to build a section of the A2 highway between Warsaw and Lodz. Covec's tender win was a landmark decision, the first time a Chinese firm had won a major construction contract in Europe. The firm won the tender process for the 50km highway with a bid so low that it caused some bidders to complain about undercutting.

Covec’s problems started soon after work started when material prices spiralled upwards. Delays mounted as did complaints from local sub-contractors over non-payment by the main contractor. Covec withdrew from the project in May 2011.

Despite the GDDKiA announcement that it plans to adhere to EU procurement law, the government agency remains besieged by construction firms locked in legal battles over how they have been treated. According to one news agency, the companies claim billions of euros are owed to them by Poland. Polish contractors have said some of them have gone to the wall because of lack of payment by the government. Six European governments have complained to Poland about the treatment meted out to private companies.

The GDDKiA’s also said its Podlaskie regional unit will spend around $228 million on road projects in 2015, up from $166 million last year. Among projects earmarked for completion are ring roads around Szczuczyn and Barglow, as well as the S8 section between the ring road of Zambrow and Mezenin.

For more information on companies in this article

Related Content

  • Lintec expands manufacturing capacity to meet market demand
    January 6, 2017
    German asphalt and concrete plant constructor Lintec is rapidly expanding its manufacturing base around the world to meet growing demand for its modular material production equipment from both well established and emerging markets. The company’s new facility in Poland has recently supplied its first CDD 1200 GA Gussasphalt plant to French company SMAC, part of the Colas Group. However, the company is also enjoying strong demand from facilities in Brazil, Shanghai and Singapore.
  • Lintec expands manufacturing capacity to meet market demand
    April 20, 2012
    German asphalt and concrete plant constructor Lintec is rapidly expanding its manufacturing base around the world to meet growing demand for its modular material production equipment from both well established and emerging markets. The company’s new facility in Poland has recently supplied its first CDD 1200 GA Gussasphalt plant to French company SMAC, part of the Colas Group. However, the company is also enjoying strong demand from facilities in Brazil, Shanghai and Singapore.
  • Aceh Road Rehabilitation project wins key IRF GRAA award
    May 15, 2014
    The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
  • Asphaltica exhibition and conference will provide asphalt road knowledge
    October 31, 2012
    The global economy is still suffering, and many believe investment in road and other infrastructure is the key to its revival Over the past 14 years in Italy, only 187km of new highways have been made, but, at the same time, the amount of vehicles using the country’s roads has grown by nearly 10 million. It is in this context of financial concern and growing burden on existing road infrastructure that the sixth edition of ASPHALTICA, the only European event exclusively dedicated to the world of asphalt, bit