Skip to main content

Poland tenders for more A2 work between Lodz and Warsaw

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
January 8, 2019 Read time: 1 min

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland.

According to the Polish General Directorate for National Roads and Motorways (1361 GDDKiA), the cost will be around €139 million with completion set for 2021.

The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport corridor II.

In Poland the A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt (Oder) through Poznań, Stryków (Łódź) and Warsaw to the Polish-Belarusian border in Kukuryki.

For more information on companies in this article

Related Content

  • Preparations for Polish project – widening work
    December 13, 2018
    Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.