Skip to main content

Poland tenders for more A2 work between Lodz and Warsaw

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
January 8, 2019 Read time: 1 min

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland.

According to the Polish General Directorate for National Roads and Motorways (1361 GDDKiA), the cost will be around €139 million with completion set for 2021.

The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport corridor II.

In Poland the A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt (Oder) through Poznań, Stryków (Łódź) and Warsaw to the Polish-Belarusian border in Kukuryki.

For more information on companies in this article

Related Content

  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • Ireland's budgert cuts impact on road projects
    May 14, 2012
    Ireland’s government is undergoing a period of belt-tightening, with a string of budget cuts that will directly impact on the transport sector. The country was in the process of spending heavily on its infrastructure but with the tough economic climate it is now facing, a number of road projects are among those facing the axe. The Irish government is slashing its infrastructure spending from €39.6 billion to €22.9 billion between now and 2013. This looks likely to result in 40 road projects, including hig
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m