Skip to main content

Poland tenders for more A2 work between Lodz and Warsaw

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
January 8, 2019 Read time: 1 min

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland.

According to the Polish General Directorate for National Roads and Motorways (1361 GDDKiA), the cost will be around €139 million with completion set for 2021.

The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport corridor II.

In Poland the A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt (Oder) through Poznań, Stryków (Łódź) and Warsaw to the Polish-Belarusian border in Kukuryki.

For more information on companies in this article

Related Content

  • Legal tangle over Polish highway project
    February 29, 2012
    The complex legal tangle over Poland's troubled A2 highway project is continuing to develop.
  • Vejdirektoratet tenders more Kalundborg
    June 6, 2025
    The Danish Road Directorate said the work on stage three of the Kalundborg Motorway will include a new junction facility as well as a large fauna underpass, a road bridge and two pedestrian bridges.
  • Central Asia’s need for improved transport infrastructure
    October 5, 2018
    Central Asia has a need for improved transport infrastructure to help develop economies - Gordon Feller reports
  • STRABAG building two more Polish routes
    January 12, 2018
    Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as