Skip to main content

Poland tenders for more A2 work between Lodz and Warsaw

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
January 8, 2019 Read time: 1 min

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland.

According to the Polish General Directorate for National Roads and Motorways (1361 GDDKiA), the cost will be around €139 million with completion set for 2021.

The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport corridor II.

In Poland the A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt (Oder) through Poznań, Stryków (Łódź) and Warsaw to the Polish-Belarusian border in Kukuryki.

For more information on companies in this article

Related Content

  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
  • Northern Poland tunnel planned to connect islands
    June 19, 2017
    Interest is strong in the Polish project being planned to connect Wolin Island and Uznam Island in the north of the country. In all 14 bids were received for the design and build contract during the tender process. The contract should be signed at the end of 2017 and the work is expected to be complete by late 2021. The project has been planned by the Polish roads authority, GDDKiA, and involves the construction of a 3.4km tunnel connection.
  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • New Polish highway projects are being planned
    August 11, 2014
    Plans are moving forward for two key highway projects in Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that the best offer for the construction of the Rzeszow - Jaroslaw section of the A4 highway has been submitted by a consortium comprising contractors Budimex and Strabag. The deal is worth some €170.63 million. Meanwhile Italian construction company Astaldi has signed a contract worth €103.23 million with GDDKiA for the S8 dual carriageway. The section of road will