Skip to main content

Poland tenders for more A2 work between Lodz and Warsaw

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
January 8, 2019 Read time: 1 min

A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland.

According to the Polish General Directorate for National Roads and Motorways (1361 GDDKiA), the cost will be around €139 million with completion set for 2021.

The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport corridor II.

In Poland the A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt (Oder) through Poznań, Stryków (Łódź) and Warsaw to the Polish-Belarusian border in Kukuryki.

For more information on companies in this article

Related Content

  • Poland: Budimex signs Olsytyn city ring-road contract
    April 4, 2016
    Budimex has signed a contract worth more than €214.3 million for construction of the second section of Olsztyn's ring-road. The section will be around 14.7km long and will be completed within 28 months. The bid by Budimex was the fourth lowest offer in the tender, as announced by the Polish General Directorate for National Roads and Motorways (GDDKiA).
  • Poland plans promise projects
    July 6, 2012
    The Polish General Directorate for National Roads and Motorways (GDDKiA) plans to announce over 30 tenders for road investments during the first half of 2009. GDDKiA's budget for 2009 is estimated at €7.68 billion. Among others, a tender will be called for the construction of a ring road around the Polish town of Krasnik and for the construction of the S19 road from Miedzyrzec Podlaski to Lubartow, which will also include the construction of two ring roads around Kocek and around Wola Skromowska. GDDKiA is
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Poland calls a tender for work on the Biskupia Gorka viaduct
    May 25, 2017
    Poland will have to spend around €7.12 billion to complete its section of the trans-European Via Carpathia. Work on the north-south transport corridor could be completed by 2025, the government said during a recent European Economic Congress held in the Polish city of Katowice. The route is planned to run nearly 1,600km from the Lithuanian Baltic Sea port city of Klaipeda to the Greek city of Thessaloniki on the Aegean Sea. It passes through Poland, Slovakia, Hungary, Romania and Bulgaria. It will cross cor