Skip to main content

Poland: tendering for Lodz's Western Ring-Road attracts 17 offers

The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
February 10, 2017 Read time: 2 mins
The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media.

Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction.

3302 Budimex has reportedly made the lowest offer in both contract contests.

Polish media also reported that €530 million from the European Union’s Cohesion Fund will be invested in northern Poland’s roads. The first project will be a €463mn investment in the Gdansk-Elblag section of the DK7 national road on the Baltic-Adriatic section of the Trans-European Transport Network (TEN-T) that connects northern and southern Europe.

The second project, worth around €68 million involves renovating the section between Wyszków and Bialystok on the E67 part of the EN-T North Baltic Sea corridor, which connects the west to the north east of Europe.

In eastern Poland, the Program Polska Wschodnia will fund six road projects in worth more than €119 million. The projects will include both new roads and extensions of existing ones. Among the projects likely to be funded are the DW762 Kielce Poludnie-Checiny in Swietokrzyskie voivodeship, DK19 in Rzeszow, DW687 Kleosin-Markowszczyzna in Podlaskie and DW676 Bialystok-Suprasl.

For more information on companies in this article

Related Content

  • Upgrading Poland's roads for UEFA 2012
    February 7, 2012
    POLAND has ambitious plans to construct around 900km of new highways in time for the European Football Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Polaqua signs S6 dual carriageway deal and Tri-City contract
    April 9, 2018
    Polish contractor Polaqua has signed a deal worth €193 million to design and build a 20km section of S6 dual carriageway. Completion is scheduled for mid-2021. Polaqua will also build a 3km section as part of the expansion of the ring road around the Tri-City area in northern Poland. Tri-City incorporates the three cities in Pomerania - Gdańsk, Gdynia and Sopot, as well as surrounding minor towns. They are situated along the coast of Gdańsk Bay on the Baltic Sea. The regional population is more than 1
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion