Skip to main content

Poland: tendering for Lodz's Western Ring-Road attracts 17 offers

The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
February 10, 2017 Read time: 2 mins
The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media.

Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction.

3302 Budimex has reportedly made the lowest offer in both contract contests.

Polish media also reported that €530 million from the European Union’s Cohesion Fund will be invested in northern Poland’s roads. The first project will be a €463mn investment in the Gdansk-Elblag section of the DK7 national road on the Baltic-Adriatic section of the Trans-European Transport Network (TEN-T) that connects northern and southern Europe.

The second project, worth around €68 million involves renovating the section between Wyszków and Bialystok on the E67 part of the EN-T North Baltic Sea corridor, which connects the west to the north east of Europe.

In eastern Poland, the Program Polska Wschodnia will fund six road projects in worth more than €119 million. The projects will include both new roads and extensions of existing ones. Among the projects likely to be funded are the DW762 Kielce Poludnie-Checiny in Swietokrzyskie voivodeship, DK19 in Rzeszow, DW687 Kleosin-Markowszczyzna in Podlaskie and DW676 Bialystok-Suprasl.

For more information on companies in this article

Related Content

  • Bosnia: more funds for Corridor C5 work
    June 25, 2021
    Bosnia’s national road agency Autoceste FBiHreports reports that 92km of Corridor 5C have been completed.
  • Bucharest win for Aktor-Eurocontsruct
    October 27, 2021
    Lot 3 of the Bucharest south ring road is worth around €173.76 million.
  • EU to provide funding for Greek highway studies
    May 10, 2012
    The Greek highway sector looks set to receive muchneeded external funding from the EU for key project studies. Co-funding will be provided by the EU for studies into major infrastructure projects. A study investigating a section of the Ionian Highway between the multi-level junction of Egnatia and the town of Kakavia in Greece will receive almost €2 million in EU contribution. This will be provided under the 2010 TEN-T Annual Call. The co-funded study will set the stage for the construction of a four-lane h
  • Polish highway connection to be completed
    January 25, 2017
    Poland is pushing ahead with plans to complete a section of the A1 highway. This stretch of the highway lies between Pyrzowice and Czestochowa in the south of the country. The work is expected to be funded to the tune of €315 million from the EU Cohesion Fund. This stretch of highway will play a key role in Poland’s future economic development when it opens to traffic in mid-2019. It will improve the transport connections with the important industrial city of Katowice in the south of the country and also wi