Skip to main content

Poland: tendering for Lodz's Western Ring-Road attracts 17 offers

The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
February 10, 2017 Read time: 2 mins
The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media.

Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction.

3302 Budimex has reportedly made the lowest offer in both contract contests.

Polish media also reported that €530 million from the European Union’s Cohesion Fund will be invested in northern Poland’s roads. The first project will be a €463mn investment in the Gdansk-Elblag section of the DK7 national road on the Baltic-Adriatic section of the Trans-European Transport Network (TEN-T) that connects northern and southern Europe.

The second project, worth around €68 million involves renovating the section between Wyszków and Bialystok on the E67 part of the EN-T North Baltic Sea corridor, which connects the west to the north east of Europe.

In eastern Poland, the Program Polska Wschodnia will fund six road projects in worth more than €119 million. The projects will include both new roads and extensions of existing ones. Among the projects likely to be funded are the DW762 Kielce Poludnie-Checiny in Swietokrzyskie voivodeship, DK19 in Rzeszow, DW687 Kleosin-Markowszczyzna in Podlaskie and DW676 Bialystok-Suprasl.

For more information on companies in this article

Related Content

  • Poland tenders for Czestochowa A1 motorway section
    June 18, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget. The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million. GDDKiA said that the bids will not automatically be rejected. Earlier this year GDDKiA terminated its contract with Salini Polska, signed
  • EU to invest €4bn in Polish transport projects
    November 22, 2013
    Major Polish transport projects connected to the TEN-T transport network and the Connecting Europe programme are to receive €4 billion of European Union funding. The S3 road from Nowa Sol to Hradec Kralove is among the Polish TEN-T road project works benefiting from the new EU fund. As part of the Connecting Europe Scheme, the €4 billion EU investment will also cover works on two major border road schemes: the S69 road from Bielsko-Biala, and the S61 from Augustow.
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Mostostal Warszawa makes lowest bids in Poland’s S9 tenders
    November 24, 2017
    A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.