Skip to main content

Poland: Rubau Polska makes lowest bid in S61Via Baltica tender

Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
August 11, 2017 Read time: 1 min

Poland’s road authority 1361 GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway.

The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million.

The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by 3302 Budimex at around €139 million.

A date for announcing the winner has not been set.

Poland’s S61 is part of European route E67 – the Via Baltica - from the Czech capital Prague to the Finnish capital Helsinki by way of Poland, Lithuania, Latvia and Estonia.

Rubau recently celebrated the opening of the company’s first project in Serbia, construction of the north approach roads to the Sava Bridge in the capital Belgrade.

For more information on companies in this article

Related Content

  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.
  • Polish projects awarded
    February 3, 2021
    A series of Polish road projects have been awarded.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the