Skip to main content

Poland place Via Carpatia on list of priorities

The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023. The government also increased the budget for building roads by €6.7 billion to €32.1 billion. The announcements are part of the National Road Construction Programme (PBDK).
July 18, 2017 Read time: 2 mins

The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023.

The government also increased the budget for building roads by €6.7 billion to €32.1 billion.

The announcements are part of the National Road Construction Programme (PBDK).

The S19 road will run from the border with Belarus in Kuznica through Sokolka, Bielsk-Podlaski to Chlebczyn.

According to Polish media, a 60km shorter route is under consideration, with the road passing through Czarna Bialostocka and Sokolka instead of Knyszyn and Korycin.

A first phase of building the road will include a small northern ring road of Bialystok Sochonie-Dobrzyniewo-Choroszcz to connect with the S8. The estimated cost for building the 248km road will reach €2.85 billion.

Meanwhile, the 1054 European Investment Bank has granted Poland a €325 million loan for three dual carriageway sections totalling 110km of the S7 and S8 dual. The roads will run through the Mazowieckie voivodeship. Poland’s state-owned development bank Bank Gospodarstwa Krajowego will distribute the loan.

Also, the European Regional Development Fund recently awarded the city of Katowice €107 towards a €127 million road investment programme.

Work includes rebuilding two major road junctions in the district of Giszowiec, where national roads 86 and 81 intersect.

For more information on companies in this article

Related Content

  • Poland: GDDKiA sets winter road maintenance budget
    October 22, 2014
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
  • Strabag to build 24km section of Poland’s S6 for €83 million
    November 2, 2015
    Publically listed Strabag has won the design and build contract to build a 24km section of Poland’s S6 for €83 million. The S6 expressway links the largest cities in northern Poland, Szczecin and Gdańsk. The publicly listed construction group Strabag will design and build the section between Goleniów and Koszalin for about €83 million. Construction of the 24 km dual carriageway asphalt road with two lanes of traffic in each direction will start this month with a scheduled finish of June 2019. The cont
  • Polish road projects commencing shortly
    November 19, 2015
    Two major road projects are planned for Poland. Spanish construction firm Dragados intends to start work building a 25km ring road around the Polish city of Radom in the second half of 2016. The road will cost over €171.67 million to construct and will be completed in 2018. The work includes building four bridges, four junctions and two pedestrian bridges. The new ring road will form a part of the S7 road and reduce journey time between Krakow, Kielce and Warsaw.