Skip to main content

Poland: Ministry decides to build missing section of A1 motorway

The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
October 24, 2016 Read time: 2 mins
The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million.

Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction.

The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020.

Earlier this year, 945 Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km between the Zawodzie Junction and Woźniki Junction.

The €108 million project is expected to be opened to traffic in the second half of 2019. The section of motorway is part of the A1 running from Gdansk in the north to the Czech border. It forms part of European Route 75. In addition to the concrete roadway, Strabag will also build the Woźniki Junction as well as bridges and several adjoining local roads.

For more information on companies in this article

Related Content

  • Metrostav/Strabag win Edvard Benes deal
    November 23, 2023
    The €22 million renovation on the bridge over the Elbe in the Czech Republic will start in 2025.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Poland’s next A2 motorway section to cost €348million
    January 21, 2019
    Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,