Skip to main content

Poland: Ministry decides to build missing section of A1 motorway

The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
October 24, 2016 Read time: 2 mins
The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million.

Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction.

The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020.

Earlier this year, 945 Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km between the Zawodzie Junction and Woźniki Junction.

The €108 million project is expected to be opened to traffic in the second half of 2019. The section of motorway is part of the A1 running from Gdansk in the north to the Czech border. It forms part of European Route 75. In addition to the concrete roadway, Strabag will also build the Woźniki Junction as well as bridges and several adjoining local roads.

For more information on companies in this article

Related Content

  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.
  • Strabag wins Polish A1 motorway deal for Wozniki-to-Pyrzowice section
    September 2, 2015
    Strabag consortium has signed a contract for construction of a 15.2km section of the A1 motorway between Wozniki and Pyrzowice. Completion of the section that will connect Pyrzowice with Czestochowa is due by the end of 2018. It is the first of four contracts signed for construction of the motorway. Strabag’s offer is believed to be around €144 million, while the budget set by the General Directorate for National Roads and Motorways (GDDKiA), was set just over €200 million. Meanwhile, the S6 dual car
  • Breakthrough on Slovakia’s D1 tunnel near Zilina
    December 12, 2016
    Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
  • Poland: €7.57bn road budget call
    February 20, 2012
    The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.